Pacificorp Portland Underground Network Willamette River Crossing

Wildwood Environmental provides onsite environmental support during replacement of an existing sub-marine electric cable beneath the Willamette River to allow for river sediment cleanup within the River Mile 11 Superfund Site. The cable replacement is being performed using the horizontal directional drill (HDD) method, and the project is located within an urban area with challenging construction access and numerous stakeholders. Wildwood Environmental maintains an onsite presence throughout all construction activities due to the highly visible and environmentally sensitive nature of the project.